Solar Project
The Kisauni Project involved the design and installation of a robust 50KW single-phase hybrid solar system at a site in Mtwapa. Using Deye inverters and bifacial Jinko 615W panels, the system delivers high efficiency and integrates seamlessly with the grid. The project utilized a low voltage topology and included advanced battery management via BMS. Full online monitoring is available through Somarman Smart. The entire system was executed and commissioned within 6 days.
Online Monitoring
Via Somarman Smart
Battery Management
BMS